久久久久久久久久网站-久久久久久久久久免费视频-久久久久久久久久免费-久久久久久久久久久影院-一级毛片一级毛片-一级毛片一级黄片

廣州正菱|三菱
當(dāng)前位置:首頁 >> 資料下載 >> 三菱 >> 伺服驅(qū)動(dòng)器和伺服電機(jī) >> 三菱 三菱-教學(xué) 手冊(cè) on A8BAT-SET Battery
三菱 三菱-教學(xué) 手冊(cè) on A8BAT-SET Battery
資料介紹:

the
large capacity battery of A8BAT-SET for MELSEC-A/QnA series CPU modules.

1. Specifications

Item Specification
Model name A8BAT
Battery type
Lithium/Thionyl chloride primary battery
(assembled battery)
Initial voltage 3.6V
Nominal current capacity 15300mAh (1700mAh 9 pcs)
Storage life 5 years (at normal temperature)
Backup time after power OFF Refer to section 3.1
Application
For memory backup of IC-RAM and retention of
power failure
A8BAT battery
130mm(5.12inch)(H) 34.5mm(1.36inch)(W)
109.6mm(4.31 inch) (D) Dimensions
A8BAT connection cable 800mm(31.5 inch)
Accessory A8BAT connection cable (AC08BAT) 1

2. Applicable CPU modules

Model name Target hardware version
Q2ASHCPU H or later
Q2ASHCPU-S1 H or later
Q4ACPU P or later
Q4ARCPU L or later
A2USHCPU-S1 G or later
A1SHCPU J or later
A1SJHCPU S or later
A1SJHCPU-S8 J or later

3. Battery life and procedure for replacement
3.1 A8BAT battery life
Battery life on each CPU depending on the power-on ratio is shown in the
following table.

Battery life
Actual value
(reference value)*3
CPU
module
type
Power-
on time
ratio
Guaranteed
value*2
Ambient
temperature75

Ambient
temperature
40
Ambient
temperature
25
After SM51, SM52
ON (Backup time
after alarm)*4
0%
8,500hr
1.0 years
27,500hr
3.1 years
32,400hr
3.7 years
90hr
3 days
30%
12,100hr
1.4 years
39,300hr
4.5 years
43,800hr
5.0 years
90hr
3 days
50%
17,000hr
1.9 years
43,800hr
5.0 years
43,800hr
5.0 years
90hr
3 days
70%
28,300hr
3.2 years
43,800hr
5.0 years
43,800hr
5.0 years
90hr
3 days
Q2ASH
CPU
100%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
90hr
3 days
0%
6,900hr
0.8 years
27,500hr
3.1 years
32,400hr
3.7 years
70hr
2 days
30%
9,900hr
1.1 years
39,300hr
4.5 years
43,800hr
5.0 years
70hr
2 days
50%
13,900hr
1.6 years
43,800hr
5.0 years
43,800hr
5.0 years
70hr
2 days
70%
23,200hr
2.6 years
43,800hr
5.0 years
43,800hr
5.0 years
70hr
2 days
Q2ASH
CPU-S1
100%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
70hr
2 days
0%
14,100hr
1.6 years
27,300hr
3.1 years
32,400hr
3.7 years
170hr
7 days
30%
20,200hr
2.3 years
39,100hr
4.5 years
43,800hr
5.0 years
170hr
7 days
50%
28,300hr
3.2 years
43,800hr
5.0 years
43,800hr
5.0 years
170hr
7 days
70%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
170hr
7 days
Q4A
CPU
100%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
170hr
7 days
0%
10,900hr
1.2 years
27,300hr
3.1 years
32,400hr
3.7 years
130hr
5 days
30%
15,600hr
1.8 years
39,100hr
4.5 years
43,800hr
5.0 years
130hr
5 days
50%
21,800hr
2.5 years
43,800hr
5.0 years
43,800hr
5.0 years
130hr
5 days
70%
36,400hr
4.2 years
43,800hr
5.0 years
43,800hr
5.0 years
130hr
5 days
Q4AR
CPU
100%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
130hr
5 days
0%
29,100hr
3.3 years
43,800hr
5.0 years
43,800hr
5.0 years
670hr
27 days
30%
41,600hr
4.7 years
43,800hr
5.0 years
43,800hr
5.0 years
670hr
27 days
50%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
670hr
27 days
70%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
670hr
27 days
A2USH
CPU-S1
100%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
670hr
27 days
0%
32,400hr
3.7 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days
30%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days
50%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days
70%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days
A1SHCPU
100%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days


Battery life
Actual value
(reference value)*3
CPU
module
type
Power-
on time
ratio
Guaranteed
value*2
Ambient
temperature75

Ambient
temperature
40
Ambient
temperature
25
After SM51, SM52
ON (Backup time
after alarm)*4
0%
32,400hr
3.7 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days
30%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days
50%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days
70%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days
A1SJH
CPU(-S8)
100%
43,800hr
5.0 years
43,800hr
5.0 years
43,800hr
5.0 years
400hr
16 days

*1: The power-on time ratio indicates the ratio of PLC power-on time to one
day (24 hours). (When the total power-on time is 12 hours and the total
power-off time is 12 hours, the power-on time ratio is 50%.)
*2: The guaranteed battery service life; equivalent to the total power failure
time that is calculated based on the characteristics value of the memory
(SRAM) supplied by the manufacturer and under the storage ambient
temperature range of -25 to 75 (operating ambient temperature of 0 to
55 ).
*3: The actual battery service life; equivalent to the total power failure time
that is calculated based on the measured value and under the storage
ambient temperature of 40 and 25 . This value is intended for
reference only, as it varies with characteristics of the memory.
*4: In the following status, the backup time after power OFF is 3 minutes.
y The battery connector is disconnected.
y The lead wire of the battery is broken.

POINT
(1) Do not use the battery exceeding its guaranteed life.
(2) If it is expected that the battery may be used exceeding its guaranteed life,
take the following measures: operate the system by ROM so that the
program can be protected even if the battery runs out while the PLC is
powered OFF, or back up programs and data in advance after SM52 turns
on (within the backup time for after alarm occurrence).
(3) When the battery (A8BAT) is not connected to the CPU module, its service
life is five years.
(4) When the battery-low special relay SM52 turns on. Immediately change the
battery.
However, if the alarm has not yet occurred, it is recommended to change the
battery periodically according to the operating condition.

3.2 Connecting procedure of A8BAT
Indication for Replacement from A6BAT to A8BAT and A8BAT battery life
ended is as follows. The PLC power needs to be ON for 10 minutes or longer
prior to battery removal.
Make sure to complete the battery replacement within 3 minutes. Failure to do
so may delete the data in memory, although it includes a condenser to back
up the memory for a while without battery. When the MELSEC-A/QnA series
is used as a UL-certificated product, the A8BAT replacement must be done by
service personnel. The service personnel are defined as experienced
technicians who have been sufficiently educated and trained, and are capable
of perceiving and avoiding operational hazard.

2)
Backup the program and the data.
Confirm the
type of the old battery.
Remove the battery connector of
the CPU module, and pull out
A6BAT being used.
Replacing battery.
Turn off the PLC power supply.
Remove the CPU module from the
base unit.
Disconnect the A8BAT connection
cable from A8BAT.
Remove A8BAT from the control
panel.
Mount a new A8BAT onto the
control panel (Screw or DIN rail is
applicable.)
Connect the A8BAT connection
cable to a new A8BAT.
1)
Open the front door of the CPU
module.
3)
Replacing from
A6BAT to A8BAT
Replacing from
A8BAT to A8BAT
H
A6BAT
MELSEC A2USHCPU-S1
RUN
ERROR
L.CLR
RESET
STOP
RUN
RESET
MITSUBISHI
Connector
of battery
Connector
of CPU
module
A6BAT




Fix the A8BAT onto the control
panel.
(Screws or DIN rail is applicable.)
Connect the A8BAT connection
cable to A8BAT while confirming
the direction of each connector.
Fix the A8BAT connection cable
to the control panel.
Turn on the PLC power supply.
2)
Monitor SM51
to verify ON/OFF.
1)
Monitor SM52
to check if bit 0 is ON.
Failure of CPU module battery. Completed
ON
OFF
Bit 0 is OFF
3)
Bit 0 is ON
A8BAT
Control panel
A8BAT
connection cable
R (bending radius)

20mm (0.79 inch)
or more
A8BAT

Mount the CPU module onto the
main base unit so that the A8BAT
connection cable connected to the
CPU module will not interfere with
the other devices.

Wire the connection cable so that
the disconnection protection is
placed inside the case
連接器 A6CON2E
網(wǎng)絡(luò)模塊 A6RCON-R75
連接器 A6CON1E
連接器 A6CON4
連接器 A6CON3
連接器 A6CON1
連接器 A6CON3
網(wǎng)絡(luò)模塊 A6RCON-R75
連接器 A6CON2E
連接器 A6CON4
連接器 A6CON3E
連接器 A6CON2
連接器 A6CON3E
連接器 A6CON2
連接器 A6CON1
調(diào)制解調(diào)器接口模塊 QJ71CMON
連接器 A6CON1E
三菱 三菱-教學(xué) 手冊(cè) on A8BAT-SET Battery     三菱 三菱-教學(xué) 手冊(cè) on A8BAT-SET Battery
相關(guān)下載
主站蜘蛛池模板: 永恒传说图文详细攻略| 中国未来会黑人化吗| 流行性感冒ppt课件| 《密爱》| 苏西| 在线播放国内自拍情侣酒店| 珠帘玉幕一共多少集| 小班健康活动教案40篇| 太深了太爽了受不了了| 北京旅游自由行最佳攻略| 赵汉善| 赌神电影| 姐妹五| 搜狐视频官网| 玛姬·格蕾斯| 大国崛起思维导图| 欧美gv网站| 肢体的诱惑| 复仇意大利| 在线黄网站| 恋爱不可抗力电视剧在线观看| 豪斯医生第六季| 2001年日历全年表| 电影《exotica》完整版观看| 久草久草在线观看| 惊天十二小时| 电影《追求》| 好看的拉片| 凤凰电视台| 电影《天启》| 周岁封酒| 薛昊婧演过的电视剧| 少年派1主演名单| 西安地铁2号线运营时间表| 齐芳| 寄诚庸| 林佑星| 画皮电影| 葛思然| 恐怖故事电影| 许薇|