久久久久久久久久网站-久久久久久久久久免费视频-久久久久久久久久免费-久久久久久久久久久影院-一级毛片一级毛片-一级毛片一级黄片

廣州正菱|三菱
當(dāng)前位置:首頁 >> 資料下載 >> 三菱 >> AJ系列CC-Link模塊 >> 三菱 CC-Link 三菱-CC-Link IE Controller Network I nter
三菱 CC-Link 三菱-CC-Link IE Controller Network I nterface Board 用戶手冊(硬件)
所屬類別:三菱 >> AJ系列CC-Link模塊
資料介紹:

A-3
[Wiring Precautions]
DANGER
Be sure to shut off all phases of the external power supply used by the
system before installing the CC-Link IE Controller Network board or starting
wiring.
Failure to do so may cause an electric shock, damage to the product or
malfunction.
Before applying power to operate the system after installation of the CC-Link
IE Controller Network board and wiring, be sure to put the cover on the
module.
Failure to do so may result in an electric shock.
CAUTION
Special skills and tools are required to connect the communication cable to
the connector plug, which is an exclusive product.
When purchasing it, please consult your local Mitsubishi representative.
Incomplete connection can result in a short, fire or malfunction.
Securely plug the communication cable to the connector of the CC-Link IE
Controller Network board. Then, check for any incomplete connection.
Poor contact may cause an erroneous input or output.
Place the communication cables and external power supply cable connected
to the CC-Link IE Controller Network board in a duct or clamp them.
If not, dangling cables may swing or inadvertently be pulled, resulting in
damage to the board or cables or malfunctions due to poor cable contact.
When disconnecting the cable from the CC-Link IE Controller Network board,
do not pull the cable part.
Pulling the cable that is still connected to the CC-Link IE Controller Network
board may damage the board and/or cable, or cause a malfunction due to
poor contact.
Prevent foreign matter such as chips or wiring debris from getting into the
personal computer.
Failure to do so can result in a fire, failure or malfunction.
Verify the rated voltage and pin-out, and connect the external power supply
cable properly.
Connecting a power supply with a different voltage rating, imperfect cable
crimping or faulty wiring may cause a fire or failure.
Use a specified tool for crimping of the cable and contacting pin. Imperfect
crimping may cause a malfunction.
Verify the pin-out and fully insert the crimped contacting pin into the
connector. Imperfect insertion may cause a failure or malfunction.
編碼器電纜 MR-JCCBL2M-H
編碼器電纜 MR-JCCBL2M-L
編碼器電纜 MR-JCCBL20M-L
編碼器電纜 MR-JCCBL30M-H
CPU單元 A2CCPUP21
CPU單元 A2CCPUR21
CPU單元 A2CCPUC24
模塊 A2CCOM-TB
C語言的控制單元 Q06CCPU-V-B
編碼器電纜 MR-JCCBL10M-L
編碼器電纜 MR-JCCBL5M-L
CC-Link用主站模塊 FX2N-16CCL-M
編碼器電纜 MR-JCCBL5M-H
編碼器電纜 MR-JCCBL20M-H
C語言QCPU Q12DCCPU-V
編碼器電纜 MR-JCCBL30M-L
CPU單元 A2CCPU
CC-Link用接口模塊 FX2N-32CCL
CPU單元 A2CCPUC24-PRF
C語言的控制單元 Q06CCPU-V
編碼器電纜 MR-JCCBL10M-H
三菱 CC-Link 三菱-CC-Link IE Controller Network I nterface Board 用戶手冊(硬件)     三菱 CC-Link 三菱-CC-Link IE Controller Network I nterface Board 用戶手冊(硬件)
相關(guān)下載
主站蜘蛛池模板: 日本电视剧《阿信》| 美国电影《黑吃黑》在线观看| 东方电视台节目表今日节目| 侠盗联盟| xzj| 宇宙巨人希曼| 侦探们的镇魂歌国语版在线观看| 社会主义道德原则| 黄色网址视频| 视力图| 沈敏| 吻胸摸激情床激烈视频| 七年级下册语文谁是最可爱的人笔记| 我们的故事 电视剧| 聊斋花弄月普通话版免费| 奇骏车友会| outlander| 怎么做发射器| 雀圣 电影| 下载抖音app| 盛夏晚晴天演员表| 四查四看自我剖析材料| 韩国三级播放| 曲丹个人资料简介| 湖北影视| 真濑树里| 刘海东| 大众故事1974意大利| 蓝眼泪简谱| 五上竖式计算300道及答案| 美国派7| 读书笔记经典常谈| 最近好看电影推荐| 风云太白山电影| 自拍在线观看| 韩宝仪个人简历| 惊魂| 建设工程价款结算暂行办法| 成年人看| 热天午后| 神经内科出科小结|